Upcoming
Projects for Subcontractor Bids
| Project: |
100
Harvester Drive, Burr Ridge, IL 60527 (Shell) |
| Description: |
Architect
Timothy Morgan Associates |
A
fully sprinklered, three story, 90,850+/- sq.ft. office building
with an exterior facade of colored, architectural precast concrete
wall panels with accent reveals and bull nosing; window openings
of insulated, tinted glass set-into thermally broken, pre-finished
aluminum framing system. The roofing system shall be a fully
ballasted, single-ply E.P.D.M membrane on rigid board insulation.
The interior includes a glass enclosed entry vestibule leading
into a two story lobby space; tow 3,000 lb hydraulic elevators,
two stair shafts, washrooms and janitor closet shall be on each
floor. The structural system consists of bar joist with metal
roof deck; concrete filled metal floor deck on steel beams and
girders all supported by steel columns with selected cross bracing,
down to concrete spread and perimeter trench footings. The mechanical
system shall have two 90-130 ton rooftop packaged units each
screened by pre-finished corrugated metal wall panels.
Please
call Dan Voss at 630-230-2000 or email
him for further information.
To
download all plans, please
click here (36MB).
|
| Discipline |
Sheet
Number |
Sheet
Title |
Date |
Link |
| Engineering |
Cover |
Cover
Sheet |
6/5/2006 |
|
| C0 |
Existing
Conditions and Demolition Plan |
6/5/2006 |
|
| C1 |
Dimensional
Control and Paving Plan |
6/5/2006 |
|
| C2 |
Grading
Plan |
6/5/2006 |
|
| C3 |
Utility
Plan |
6/5/2006 |
|
| C4 |
Erosion
Control Plan |
6/5/2006 |
|
| C5 |
Details |
6/5/2006 |
|
| C6 |
Details |
6/5/2006 |
|
| C7 |
Specifications |
6/5/2006 |
|
| C8 |
Specifications |
6/5/2006 |
|
| C9 |
Stormwater
Pollution Prevention Plan |
6/5/2006 |
|
| C10 |
Stormwater
Pollution Prevention Plan |
6/5/2006 |
|
| |
| Architectural |
A001 |
Cover
Sheet |
5/31/2006 |
|
| A002 |
Site
Plan |
5/31/2006 |
|
| A101 |
First
Floor Plan |
5/31/2006 |
|
| A102 |
Second
Floor Plan |
5/31/2006 |
|
| A103 |
Third
Floor Plan |
5/31/2006 |
|
| A104 |
Roof
Plan |
5/31/2006 |
|
| A105 |
Door
& Room Finish Schedule, Details |
5/31/2006 |
|
| A201 |
Exterior
Elevations |
5/31/2006 |
|
| A202 |
Exterior
Elevations & Building Section |
5/31/2006 |
|
| A301 |
Enlarged
Core Plans |
5/31/2006 |
|
| A302 |
Stair
Details, Interior Elevations |
5/31/2006 |
|
| A401 |
Wall
Sections, Details |
5/31/2006 |
|
| A402 |
Wall
Sections, Details |
5/31/2006 |
|
| A501 |
First
Floor Reflected Ceiling Plan |
5/31/2006 |
|
| A502 |
Second
Floor Reflected Ceiling Plan |
5/31/2006 |
|
| A503 |
Third
Floor Reflected Ceiling Plan |
5/31/2006 |
|
| |
| Structural |
S1 |
Foundation
Plan |
4/5/2006 |
|
| S2 |
Foundation
Details |
4/5/2006 |
|
| S3 |
Second
Floor Framing Plan |
4/5/2006 |
|
| S4 |
Third
Floor Framing Plan |
4/5/2006 |
|
| S5 |
Roof
Framing Plan |
4/5/2006 |
|
| S6 |
Framing
Details |
4/5/2006 |
|
| S7 |
Framing
Details |
4/5/2006 |
|
| S8 |
Bracing
Details |
4/5/2006 |
|
| S9 |
General
Notes |
4/5/2006 |
|
| |
| Plumbing |
P101 |
Plumbing
First Floor Plan |
5/31/2006 |
|
| P102 |
Plumbing
Second Floor Plan |
5/31/2006 |
|
| P103 |
Plumbing
Third Floor Plan |
5/31/2006 |
|
| P104 |
Plumbing
Roof Plan |
5/31/2006 |
|
| P105 |
Plumbing
Schedules and Details |
5/31/2006 |
|
| P106 |
Plumbing
Waste and Riser Diagrams |
5/31/2006 |
|
| |
| Mechanical |
M101 |
Mechanical
First Floor Plan |
5/31/2006 |
|
| M102 |
Mechanical
Second Floor Plan |
5/31/2006 |
|
| M103 |
Mechanical
Third Floor Plan |
5/31/2006 |
|
| M104 |
Mechanical
Roof Plan |
5/31/2006 |
|
| M105 |
Mechanical
Schedules |
5/31/2006 |
|
| |
| Electrical |
E101 |
Electrical
First Floor Plan |
5/31/2006 |
|
| E102 |
Electrical
Second Floor Plan |
5/31/2006 |
|
| E103 |
Electrical
Third Floor Plan |
5/31/2006 |
|
| E104 |
Electrical
Schedules |
5/31/2006 |
|
| E105 |
Electrical
Service Riser Diagram |
5/31/2006 |
|
| E106 |
Electrical
Specification and Notes |
5/31/2006 |
|
| E107 |
Electrical
Schedules and Details |
5/31/2006 |
|