Upcoming Projects for Subcontractor Bids

Project: 100 Harvester Drive, Burr Ridge, IL 60527 (Shell)
Description: Architect Timothy Morgan Associates

A fully sprinklered, three story, 90,850+/- sq.ft. office building with an exterior facade of colored, architectural precast concrete wall panels with accent reveals and bull nosing; window openings of insulated, tinted glass set-into thermally broken, pre-finished aluminum framing system. The roofing system shall be a fully ballasted, single-ply E.P.D.M membrane on rigid board insulation. The interior includes a glass enclosed entry vestibule leading into a two story lobby space; tow 3,000 lb hydraulic elevators, two stair shafts, washrooms and janitor closet shall be on each floor. The structural system consists of bar joist with metal roof deck; concrete filled metal floor deck on steel beams and girders all supported by steel columns with selected cross bracing, down to concrete spread and perimeter trench footings. The mechanical system shall have two 90-130 ton rooftop packaged units each screened by pre-finished corrugated metal wall panels.

Please call Dan Voss at 630-230-2000 or email him for further information.

To download all plans, please click here (36MB).

 

Discipline Sheet
Number
Sheet Title
Date
Link
Engineering Cover Cover Sheet
6/5/2006
C0 Existing Conditions and Demolition Plan
6/5/2006
C1 Dimensional Control and Paving Plan
6/5/2006
C2 Grading Plan
6/5/2006
C3 Utility Plan
6/5/2006
C4 Erosion Control Plan
6/5/2006
C5 Details
6/5/2006
C6 Details
6/5/2006
C7 Specifications
6/5/2006
C8 Specifications
6/5/2006
C9 Stormwater Pollution Prevention Plan
6/5/2006
C10 Stormwater Pollution Prevention Plan
6/5/2006
 
Architectural A001 Cover Sheet
5/31/2006
A002 Site Plan
5/31/2006
A101 First Floor Plan
5/31/2006
A102 Second Floor Plan
5/31/2006
A103 Third Floor Plan
5/31/2006
A104 Roof Plan
5/31/2006
A105 Door & Room Finish Schedule, Details
5/31/2006
A201 Exterior Elevations
5/31/2006
A202 Exterior Elevations & Building Section
5/31/2006
A301 Enlarged Core Plans
5/31/2006
A302 Stair Details, Interior Elevations
5/31/2006
A401 Wall Sections, Details
5/31/2006
A402 Wall Sections, Details
5/31/2006
A501 First Floor Reflected Ceiling Plan
5/31/2006
A502 Second Floor Reflected Ceiling Plan
5/31/2006
A503 Third Floor Reflected Ceiling Plan
5/31/2006
 
Structural S1 Foundation Plan
4/5/2006
S2 Foundation Details
4/5/2006
S3 Second Floor Framing Plan
4/5/2006
S4 Third Floor Framing Plan
4/5/2006
S5 Roof Framing Plan
4/5/2006
S6 Framing Details
4/5/2006
S7 Framing Details
4/5/2006
S8 Bracing Details
4/5/2006
S9 General Notes
4/5/2006
 
Plumbing P101 Plumbing First Floor Plan
5/31/2006
P102 Plumbing Second Floor Plan
5/31/2006
P103 Plumbing Third Floor Plan
5/31/2006
P104 Plumbing Roof Plan
5/31/2006
P105 Plumbing Schedules and Details
5/31/2006
P106 Plumbing Waste and Riser Diagrams
5/31/2006
 
Mechanical M101 Mechanical First Floor Plan
5/31/2006
M102 Mechanical Second Floor Plan
5/31/2006
M103 Mechanical Third Floor Plan
5/31/2006
M104 Mechanical Roof Plan
5/31/2006
M105 Mechanical Schedules
5/31/2006
 
Electrical E101 Electrical First Floor Plan
5/31/2006
E102 Electrical Second Floor Plan
5/31/2006
E103 Electrical Third Floor Plan
5/31/2006
E104 Electrical Schedules
5/31/2006
E105 Electrical Service Riser Diagram
5/31/2006
E106 Electrical Specification and Notes
5/31/2006
E107 Electrical Schedules and Details
5/31/2006